tel: 503-720-2756
email:melstout@ykwc.net

 

 

 

Field analysis, design and construction plans including trail design, trail layout, trail flagging, trail master planning, greenway planning,  trails and greenways master planning, public involvement

Field analysis, design and construction plans including trail design, trail layout, trail flagging, trail master planning, greenway planning,  trails and greenways master planning, public involvement

Field analysis, design and construction plans including trail design, trail layout, trail flagging, trail master planning, greenway planning,  trails and greenways master planning, public involvement

Field analysis, design and construction plans including trail design, trail layout, trail flagging, trail master planning, greenway planning,  trails and greenways master planning, public involvement

 

 

 


Marquam Nature Park

  • Prepared a master plan for the park, site design and construction plans for the visitor center
  • Designed and flagged all the initial trails in the park and connecting links to the 40-Mile Loop Trail

Peninsula Crossing Trail

  • Provided project design advise and quality control review for trail heads, street crossings, and the pathway
  • Provided master plan design

 

Mary S. Young State Park Board Walk

  • Designed the boardwalk as part of a nature walk between day use areas and the Willamette River

 

40-Mile Loop Trail Master Plan

  • Prepared the 1983 master plan. The plan and efforts to complete the Loop gained early national recognition and the Loop continues to grow in popularity. It is over three-fourths complete, is over 100 miles in length and encircles much of the Portland metropolitan area.


Acknowledgement:
Many portoflio projects shown were accomplished while practicing as the Director of Landscape Architecture at David Evans and Associates, Inc.

 
 
 
 

Home | Profile | Services | Service & Awards | Portfolio | Contact | Links
© 2009 Mel Stout, Landscape Architect. All Rights Reserved.